Pictures below show some progress installation photos. Multiple service conflicts were encountered and located prior to construction to ensure constructability.
Pipeline material was PE, Below photo’s show extents of PE welding utilising both Electro fusion and Butt welding methods. Stubs fitted with Weep flanges for penetrations into MH’s.
Environmental controls have been installed to manage sediment. Below pictures show the PE lining installed within the chambers. Also shown is the benching being completed.